1981 Moved to Wusheng District, New Taipei City
1991 Lead-in furan no-bake molding process
2000 Purchased furan no-bake automatic molding equipment
2003 Hired Dr. Xu Fuyuan as Technical Consultant
(University of Birmingham, UK and Napier University, UK)
Introduced casting simulation analysis technology (Flow3d)
2006 Old factory reconstruction
2015 Lead-in inert gas degassing equipment
2016 Obtained the semiconductor equipment production approval
2017 Cooperated again with National Chung-Shan Institute of Science & Technology (NCSIST) to produce defense parts
News